PK Technical Services Co.  ·  Established 2024  ·  Madina Mall, Muhaisnah 4, Dubai info@apexsaunasteam.com  ·  +971 50 123 4567
Home / Services / Sauna room installation in Dubai
Completed hemlock sauna room with concealed LED lighting under both bench tiers
Dry heat

Sauna room installation in Dubai

Most saunas that fail in Dubai fail for the same three reasons: the vapour barrier was stapled instead of taped, the bench timber had knots in it, and the heater was sized for the floor area rather than the room volume. None of those are visible on handover day. All three show up somewhere between month eight and year two.

We build custom sauna rooms as a sealed system — insulated shell, continuous foil barrier, ventilated cavity, knot-free cladding and a heater matched to the cubic volume. The result heats in thirty minutes, holds temperature without cycling constantly, and does not warp when the room outside it sits at 45°C for five months of the year.

What the build involves

The shell and the vapour barrier

A sauna is a box inside a box. We frame in treated timber, pack the cavity with 50mm mineral wool, then line the warm side with aluminium foil barrier — overlapped 100mm and taped at every joint, never stapled through. Staple holes let moisture into the insulation, and wet insulation stops insulating. This layer is the single biggest difference between a cabin that lasts fifteen years and one that smells of damp by year three.

Cladding and bench timber

Walls and ceiling go in Nordic spruce or hemlock; benches go in knot-free abachi or aspen. The distinction matters because knots conduct heat far faster than surrounding timber and reach skin-burning temperature in a room already at 90°C. Bench slats are spaced 8mm apart for airflow and fixed from underneath, so no fixing head ever touches skin.

Heater sizing and electrics

Roughly 1kW of heater per cubic metre of cabin, adjusted upward for glass area and downward for a well-insulated internal room. A 4-person cabin typically lands on a 6kW unit needing a dedicated 32A circuit. From 9kW you generally need three phase, which villas usually have and apartments usually do not. We open your distribution board at survey rather than discovering the problem on installation day.

Ventilation and commissioning

Air inlet low beside the heater, outlet high on the opposite wall, sized so the cabin turns its air over three to six times an hour. Without it the room stratifies, the upper bench cooks and the lower bench stays lukewarm. We run a full heat cycle at handover and verify the temperature at both bench heights against the specification before we hand over the keys.

Specification

ItemDetail
Operating temperature80–100°C at bench height
Humidity5–15%, rising briefly with löyly water
Heat-up time30–40 minutes from cold
Wall build-upFrame, 50mm mineral wool, foil barrier, 20mm cavity, cladding
Cladding timberNordic spruce, hemlock or thermowood
Bench timberKnot-free abachi or aspen, 8mm spacing
Heater brandsHarvia, Tylö, Sawo, EOS, Helo
Electrical6kW / 32A single phase, or 9kW+ three phase
Ventilation3–6 air changes per hour, low inlet and high outlet
Warranty2 years workmanship, manufacturer warranty on heater

What it costs in Dubai

Installed prices inclusive of materials, labour, electrical second fix and commissioning. Your quote lands inside one of these bands once we have measured the space.

OptionTypical sizeInstalled price (AED)Lead time
Compact 2-person cabin1.2 × 1.5 m32,000 – 48,0005–7 weeks
Standard 4-person cabin1.8 × 2.0 m45,000 – 72,0006–10 weeks
6-person cabin with glass front2.0 × 2.4 m68,000 – 95,0008–12 weeks
Commercial cabin, gym or hotel8+ person95,000 – 180,00010–16 weeks

The three things that move a sauna quote most are glass area, timber grade and heater rating. A full-height glass front adds AED 8,000 to 15,000 and pushes the heater up a size because glass loses heat far faster than an insulated wall. Thermowood cladding costs roughly 40% more than spruce but survives outdoor and semi-outdoor positions that spruce will not.

How it compares

Choose a sauna if

  • You want intense dry heat at 80–100°C
  • You want the lower build cost — no tanking, no drainage falls
  • You have a dry internal room, a cupboard or a spare bathroom to convert
  • You want it usable 30 minutes after switching on
  • You like the ritual of löyly water on hot stones

Choose a steam room if

  • You or anyone in the household finds dry heat harsh on the airways
  • You want the sinus and skin benefits of saturated humidity
  • You already have a wet room, a drain and a fall to work with
  • You are converting an existing shower enclosure
  • You do not mind six-monthly generator descaling

Villa clients with the space frequently build both, with a cold plunge between them. That is the sequence every hotel spa in Dubai uses, and it works just as well in a basement.

Where we install

Dubai is home. Every other emirate carries a mobilisation line on the quote so you can see exactly what the travel costs.

Questions we get asked most

How much does a sauna room cost to install in Dubai?

A compact two person cabin runs AED 32,000 to 48,000 installed. A standard four person sauna is AED 45,000 to 72,000. A six person cabin with a glass front reaches AED 95,000. Commercial cabins for gyms and hotels start around AED 95,000. Those figures include timber, insulation, heater, electrical second fix, glass and commissioning.

How long does sauna installation take?

Six to ten weeks for a custom cabin from signed quote to commissioning. Roughly half of that is timber lead time. If you need it faster, a pre-built modular cabin is delivered and assembled in two to four weeks.

What size room do I need for a sauna?

A two person sauna needs about 1.2 by 1.5 metres of floor and 2.1 metres of ceiling height. Four people need 1.8 by 2.0 metres. Ceiling height matters more than people expect — anything above 2.3 metres wastes heater capacity warming air nobody is sitting in.

Which sauna wood is best for the UAE climate?

Nordic spruce and hemlock for internal cabins, thermowood for anything exposed to outdoor humidity swings. Cedar smells wonderful and resists moisture but costs considerably more. What matters more than species is that bench timber is knot-free, because knots get hot enough to burn skin.

Can I convert a bathroom into a sauna?

Yes, and it is one of the cheaper routes because the room already has the electrical run and often a floor drain. The main checks are ceiling height, whether the existing tiles need removing, and whether the distribution board has a spare way for a dedicated heater circuit.

Do you service saunas you did not build?

Yes. We carry Harvia, Tylö, Sawo, EOS and Helo parts, and a large share of our maintenance work is on cabins installed by other companies. See our sauna maintenance page for what an annual service covers.

Talk to us about your room

Send a photo of the space and a rough size on WhatsApp and you will get an indicative range the same day. A firm quote follows the site survey.

COMPANY
PK Technical Services Co.
Established 2024
ADDRESS
Madina Mall, Muhaisnah 4
Beirut Street, P.O. Box 211516
Dubai, United Arab Emirates
CALL OR WHATSAPP
+971 50 123 4567